Contract No:
Date:
The Buyer:
The Seller:
The Contract, made out, in Chinese and English, both version being equally authentic, by and between the Seller and the Buyer whereby the Seller agrees to sell and the Buyer agrees to buy the undermentioned goods subject to terms and conditions set forth hereinafter as follows:
1 Name of Commodity and specification
2 Country of Origin & Manufacturer
3 Unit Price (packing charges included)
4 Quantity
5 Total Value
6 Packing (seaworthy)
7 Insurance (to be covered by the Buyer unless otherwise)
8 Time of Shipment
9 Port of Loading
10 Port of Destination
mark shown as below in addition to the port of destination, package number, gross and net weights, measurements and other marks as the Buyer may require stencilled or marked conspicuously with fast and unfailing pigments on each package. In the case of dangerous and/or poisonous cargo(es), the Seller is obliged to take care to ensure that the nature and the generally adopted symbol shall be marked conspicuously on each package..
12 Terms of Payment:
One month prior to the time of shipment the Buyer shall open with theBank of _______an irrevocable Letter of Credit in favour of the Seller payable at the issuing bank against presentation of documents as stipulated under Clause 18. A. of SECTION II, the Terms of Delivery of this Contract after departure of the carrying vessel. The said Letter of Credit shall remain in force till the 15th day after shipment.
13 Other Terms:
Unless otherwise agreed and accepted by the Buyer, all other matters related to this contract shall be governed by Section II, the Terms of Delivery which shall form an integral part of this Contract. Any supplementary terms and conditions that may be attached to this Contract shall automatically prevail over the terms and conditions of this Contract if such supplementary terms and conditions come in conflict with terms and conditions herein and shall be binding upon both parties.
FOR THE SELLER FOR THE BUYER
SECTION 2
14 FOB/FAS TERMS
14.1 The shipping space for the contracted goods shall be booked by the Buyer or the Buyer’s shipping agent __________.
14.2 Under FOB terms, the Seller shall undertake to load the contracted goods on board the vessel nominated by the Buyer on any date notified by the Buyer, within the time of shipment as stipulated in Clause 8 of this Contract.
14.3 Under FAS terms, the Seller shall undertake to deliver the contracted goods under the tackle of the vessel nominated by the Buyer on any date notified by the Buyer, within the time of shipment as stipulated in Clause 8 of this Contract.
14.4 10-15 days prior to the date of shipment, the Buyer shall inform the Seller by cable or telex of the contract number, name of vessel, ETA of vessel, quantity to be loaded and the name of shipping agent, so as to enable the Seller to contact the shipping agent direct and arrange the shipment of the goods. The Seller shall advise by cable or telex in time the Buyer of the result thereof. Should, for certain reasons, it become necessary for the Buyer to replace the named vessel with another one, or should the named vessel arrive at the port of shipment earlier or later than the date of arrival as previously notified to the Seller, the Buyer or its shipping agent shall advise the Seller to this effect in due time. The Seller shall also keep in close contact with the agent or the Buyer.
14.5 Should the Seller fail to load the goods on board or to deliver the goods under the tackle of the vessel booked by the Buyer. Within the time as notified by the Buyer, after its arrival at the port of shipment the Seller shall be fully liable to the Buyer and responsible for all losses and expenses such as dead freight, demurrage. Consequential losses incurred upon and/or suffered by the Buyer.
14.6 Should the vessel be withdrawn or replaced or delayed eventually or the cargo be shut out etc., and the Seller be not informed in good time to stop delivery of the cargo, the calculation of the loss in storage expenses and insurance premium thus sustained at the loading port shall be based on the loading date notified by the agent to the Seller (or based on the date of the arrival of the cargo at the loading port in case the cargo should arrive there later than the notified loading date). The abovementioned loss to be calculated from the 16th day after expiry of the free storage time at the port should be borne by the Buyer with the exception of Force Majeure. However, the Seller shall still undertake to load the cargo immediately upon the carrying vessel’s arrival at the loading port at its own risk and expenses. The payment of the afore-said expenses shall be effected against presentation of the original vouchers after the Buyer’s verification.
15 C&F Terms
15.1 The Seller shall ship the goods within the time as stipulated in clause 8 of this Contract by a direct vessel sailing from the port of loading to China port. Transhipment on route is not allowed without the Buyer’s prior consent. The goods shall not be carried by vessels flying flags of countries not acceptable to the Port Authorities of China.
該內容對我有幫助 贊一個
加工承攬合同(1)
2020-06-18建筑裝飾工程施工合同 (甲種本)(示范文本)
2020-06-18自愿出資入股協議書
2020-06-19XXXX電子商務有限公司和xx物流公司之間的合作協議
2020-06-22建房基礎施工合同
2020-06-23辦公用品及耗材采購合同
2020-06-23國際電纜購銷合同
2020-06-23三方服務銷售合同模版
2020-06-23施工現場安全用電協議書 (1)
2020-06-24委托物業管理合同
2020-06-24車庫租賃合同
2020-06-24委托培訓合同
2020-06-24城市供用氣合同
2020-06-24投資入股協議書(正式版)(1)
2020-06-24合作建房協議書
2020-06-24合 伙 經 營 協 議 書
2020-06-28建設工程承包合(二)
2020-06-28建設工程施工合同 (港口)
2020-06-29融資租賃合同(3)
2020-06-29種養殖項目合作協議書
2020-06-29